“Delivery to the venue” sounds precise until the driver reaches a locked service entrance. A useful logistics brief describes the entire route from vehicle to equipment position—and assigns someone to meet the delivery.

Document the route, not just the address

Record the correct entrance, unloading arrangements, stairs, door widths and any lift dimensions or load limits supplied by the venue. Include the distance from unloading point to the event space. Send photographs where they resolve ambiguity. Check access and permissions with the venue; a public postcode does not explain a service entrance.

Give every movement a time window

StageWhat to agree
DeliveryAccess window, receiving person, equipment location
SetupWho moves, unpacks and positions each item
Event endWho clears food remains and sorts equipment
CollectionReady time, holding area and handover contact

Allow for venue access hours and other suppliers using the same loading area. Delivery, carrying upstairs, setup and dismantling are different tasks. Confirm which are included and which require a separate quote.

Name two people, not five departments

Choose one lead for receiving and one for return, with mobile numbers and a deputy. Give them the final equipment list and agreed service scope. At delivery, count transport units and record discrepancies promptly. At return, reconcile items against the same list and document anything that needs clarification.

Reserve space for the invisible equipment

Empty racks, flight cases and packaging remain part of the event. Decide where they can stand without blocking circulation or venue-designated escape routes. Keep clean stock and used equipment apart. Agree any power and water requirements directly with the caterer and venue before booking equipment that depends on them.

The most useful logistics question is: who will do the next physical step, at what time, and with what access?

Send the final brief to the people delivering, receiving and collecting. Reconfirm it after any room, date or access change. A revised floor plan is also a revised logistics plan.

Find the right equipment ↗